| Manhattan Tunnels Excavation - Roadheader |
|
|
|
Assembly
of Roadheader |
Roadheader |
Roadheader
at Work |
|
 |
 |
Roadheader's Teeth |
Mucking Out GCT 3 Wye |
Roadheader Excavation at GCT Wye |
Completed Tunnel Section |
 |
|
 |
West Bound Tunnel
Bore |
Double click "play" button
to start video. |
Bulkhead Showing Crown Slick Line |
 |
|
|
Completed Concrete Plug Removal |
|
|
Conveyor Belt System |
 |
|
|
Assembly of Conveyor
Belt |
Muck Travelling on Conveyor
Belt |
Muck Pile |
TBM Assembly |
 |
 |
|
First
TBM partially assembled during testing prior to arrival on-site |
TBM
arrival on-site being removed in parts from containers |
TBM
part being lowered to tunnel mouth in Queens |
 |
 |
 |
TBM
cutter blades |
Assembling
second TBM in tunnel assembly chamber |
Assembling
second TBM in tunnel assembly chamber |
TBM Entrance Preparation |
|
|
|
Tunnel entrance on Queens side. |
Tracks to outfit the tunnel |
Repaving tunnel entrance floor |
Manhattan Tunnels Excavation |
|
|
|
Mining with SELI at Lower Level |
Mining through Concrete Plug |
|
|
|
|
|
TBM breakthrough at a "Y" tunnel intersection |
Two tunnels meeting at another "Y" tunnel intersection |
TBM backed up to begin another tunnel drive |
|
|
|
|
MTA/LIRR
East Side Access —
May 2012
|