mta.info
 
.

MTA Long Island Rail Road’s
Connection to Grand Central Terminal
Back Home
Catenary Pole Installation
Concrete into a Catenary Foundation Pile
Gabion Wall at Catenary Foundation
Hand digging of catenary foundations

Foundation for Catenary Pole
Hand Digging of Catenary Foundations Between Main Lines
Drilling a Catenary Foundation

Preparing for Track Relocation
1
1
CQ028
Preparing Lower Deck
Steel Brace Preparation
Deck Pile Boring Machine

CQ028
Rebar and Form Work in Queens
Lower Deck Girders
Rebar and Formwork for Lower Deck over Open Cut

Installation of Steel Bracing Reinforcement
CQ028 progress
Slurry wall excavation - 1208 progress
Chamber excavation and strut installation photo

Reinforcement struts for slurry wall installed
2nd level of reinforcement struts for slurry wall installed
Early access chamber excavation and strut installation

Launch Chamber Site Preparation
Amtrak building before demolition Site of demolished Amtrak building CQ028 preparation
Amtrak building to be demolished
Site after demolition of Amtrak building
Site being prepared for reinforcement

Slurry Wall Construction
Slurry Wall concrete pour
Slurry Wall
Concrete pour for slurry wall
Slurry Wall
Slurry Wall preparation

Environmental Monitoring
Taking Samples
Completed Soil Disposal
Collecting Water Sample


MTA/LIRR East Side Access — August 2009