| Catenary Pole Installation |
|
|
|
Concrete into a Catenary Foundation Pile |
Gabion Wall at Catenary Foundation |
Hand digging of catenary foundations |
|
|
|
|
Foundation
for Catenary Pole |
Hand Digging of Catenary Foundations Between Main Lines |
Drilling a Catenary Foundation |
|
| Preparing
for Track Relocation |
 |
|
 |
Preparing
Lower Deck |
Steel
Brace Preparation |
Deck
Pile Boring Machine |
|
 |
|
|
Lower
Deck Girders |
Rebar
and Formwork for Lower Deck over Open Cut |
|
|
| Installation
of Steel Bracing Reinforcement |
 |
|
 |
|
Reinforcement
struts for slurry wall installed |
2nd
level of reinforcement struts for slurry wall installed |
Early
access chamber excavation and strut installation |
|
| Launch
Chamber Site Preparation |
 |
 |
 |
Amtrak
building to be demolished |
Site
after demolition of Amtrak building |
Site
being prepared for reinforcement |
|
| Slurry
Wall Construction |
|
|
|
Concrete pour for slurry wall |
Slurry Wall |
Slurry Wall preparation |
|
| Environmental Monitoring |
|
|
|
Taking Samples |
Completed Soil Disposal |
Collecting Water Sample |
|
MTA/LIRR
East Side Access — August 2009
|