Install Fiber Optic Cable: Phase 1

Fully Funded: 
NO
ReferenceNumber: 
MW17-6677
Locations: 
Various Locations
Duration: 
21 Months
ProjectDescription: 
This project will install new fiber optic cable along the right-of-way, at locations systemwide to be determined based on need. The new cable will replace existing fiber optic cable that has deteriorated due to temperature-related stresses in outdoor and transitional locations. In addition, higher-capacity cables will be installed to alleviate network congestion in certain areas. This project will ensure the efficient operation of the new SONET/ATM fiber optic network, which was installed in a previous capital program.
TypeofContract: 
Constr
DollarRange: 
$10M - $50M
SolicationMonth: 
September, 2012
Agency: