
LIRR Quiksilver Pro NY Package - Shred Those Waves
and Save Some Cash
Take the LIRR to
the World’s Top Surf Contest
In Long Beach 
From September 1 through September 15 the world’s top surfers will converge on
Long Beach to test their wave riding skills
as they vie for a $1 million purse, the
highest ever in a surf competition. Along
with the competition for the best waves,
there will be the challenge of very limited
local parking. The best solution, if you’re
not Kelly Slater (surfing’s Michael Jordan),
is to take the train to the surf.
The LIRR Quiksilver Pro NY Package will
save you money because it includes
discounted beach admission, a round-trip
LIRR ticket and a coupon for deals from
participating merchants. The LIRR roundtrip
package from September 1 - September 5
is $21 from NY and Brooklyn, $18 from
Jamaica and $14.50 fromValley Stream
and Lynbrook. From September 6 -
September 15, the package is $16.50 fromNY and Brooklyn, $11.50 from Jamaica and
$5.50 fromValley Stream and Lynbrook.
The $12 Long Beach entry fee will be
charged through Labor Day, September 5.
In addition to the surfing, there will also be skate, freestyle moto and BMX demos by
the world’s best along with concerts and
plenty to eat and drink. The Long Beach LIRR station is just a six
minute walk from the competition sites.
The LIRR will provide additional train
service to/from Long Beach on September
3-5 and September 10-11, the days
expected to have the largest attendance.
Further information and train schedule
details will be available on the LIRR website
and by contacting the
LIRR Travel Information Center at
718-217-5477.
Labor Day Weekend Service,
September 2-5
On Friday, September 2, extra eastbound
service will be provided for customers
getting away early for the last official
weekend of summer. Nine additional
Friday afternoon trains will depart Penn
Station between 2:10 PM and 3:48 PM,
operating on the Babylon, Far Rockaway,
Port Jefferson and Port Washington
branches.
The LIRR will operate
on a weekend schedule
on Saturday and
Sunday, September 3 and 4 and on a
Sunday/holiday schedule on Monday,
Labor Day, September 5. Please note: the
usual Sunday afternoon westbound trains
from Montauk and the Hamptons will not
operate on Sunday September 4, but
will instead run on Monday, September 5 -
Labor Day.
CityTicket to Mets & U.S. Open
LIRR customers can now use
CityTicket for direct travel to and from
Mets-Willets Point station. The special
discounted ticket is now available for Mets
fans and tennis buffs attending the U.S.
Tennis Open (August 27-September 11).
CityTicket is good for travel between Penn
Station,Woodside and Mets-Willets Point
and between the Queens stations on the
Port Washington Branch (Flushing Main
Street, Murray Hill, Broadway, Auburndale,
Bayside, Douglaston and Little Neck) and
Mets-Willets Point. CityTicket cannot be
used to travel between Mets-Willets Point
& Brooklyn, Jamaica Station or for “via”
trips that require transfers from other
branches.
Commuters please note: Monthly and
Weekly tickets to/from Fare Zone 1 can be
used to Mets-Willets Point.
Main Line Track Work Affects Weekend Train Service This Month
Track modernization work on the Main Line
in the Mineola area affects weekend train
service on five branches through the end of
this month.
Schedule adjustments and some train
cancellations will impact the Port Jefferson,
Oyster Bay, Ronkonkoma, Far Rockaway
and Babylon branches on the weekends of
August 13-14, August 20-21 and August
27-28. The work includes the installation of
new running rail, resurfacing of tracks and
switches and other repairs on theWillis
Avenue grade crossing in Mineola.
The result will be a smoother ride for
customers on trains traveling through the
area as well as more reliable service.
On all three weekends, the work will get
underway on Saturday morning shortly after
12:30 AM and continue through 10 AM on
Sunday morning, when regular train service
will resume.
Service Impacts
Port Jefferson Branch - Train service
to/from Huntington will be provided once
every hour, instead of half-hourly and some
trains will depart three minutes earlier.
Train service to/from Port Jefferson will
operate every two hours instead of every
90 minutes.
Oyster Bay Branch - Trains will operate
every two hours.
Ronkonkoma Branch - The 12:16 AM train
from Penn Station to Ronkonkoma will
depart 14 minutes later.
Babylon Branch - Trains departing Penn
Station on Saturdays at 7:40 AM, 8:40 AM,
9:40 AM and 11:40 AM will have increased
travel times of 8 minutes.
Sunday trains departing Penn Station at
7:40 AM and 8:40 AM will also have
increased travel times of 8 minutes.
Far Rockaway Branch - Saturday
night/Sunday morning customers who
normally take the 12:16 AM train from
Penn Station and connect at Jamaica for
the Far Rockaway train will need to leave
15 minutes earlier than usual on each
impacted weekend. Customers should
instead board the 12:01 AM Babylon train
at Penn Station and change at Jamaica for
the Far Rockaway connection.
For further information, pick up a copy of
the Special Weekend Track Work timetable or contact the
LIRR’s Travel Information Center at
718-217-5477. Customers can receive
the latest train service information each
weekend by signing up for LIRR E-alerts and
text messages. Service info will also be
provided on the LIRR’s Facebook page and
on Twitter.
St. Albans Track Work To accommodate track work, shuttle vans
will replace weekend trains to/from the
St. Albans Station on Sunday, August 14
starting at 10 AM and continuing through
2 AM on Monday, August 15. The special
vans will provide transportation between
St. Albans and Jamaica Station.
July OTP
The overall on-time performance for July was 93.63%.
| BRANCH | AM Peak |
PM Peak |
Off- Peak |
Total July 2011 |
Total July 2010 |
|---|---|---|---|---|---|
| Babylon | 98.9% | 83.4% | 93.0% | 92.6% | 90.6% |
| Far Rockaway | 97.3% | 96.1% | 97.5% | 97.3% | 96.3% |
| Hicksville/Huntington | 99.0% | 84.3% | 95.5% | 94.6% | 90.9% |
| Hempstead | 98.5% | 90.0% | 98.0% | 97.2% | 95.5% |
| Long Beach | 99.1% | 92.0% | 94.4% | 94.7% | 95.7% |
| Montauk | 93.8% | 76.0% | 83.5% | 84.0% | 87.1% |
| Oyster Bay | 98.6% | 88.3% | 96.8% | 96.0% | 94.7% |
| Port Jefferson | 96.3% | 80.7% | 94.5% | 93.0% | 87.6% |
| Port Washington | 98.6% | 89.0% | 94.5% | 94.2% | 90.3% |
| Ronkonkoma/Greenport | 97.2% | 86.4% | 92.0% | 92.2% | 89.9% |
| West Hempstead | 97.0% | 85.8% | 95.8% | 94.0% | 95.8% |
| TOTAL | 98.0% | 86.6% | 94.0% | 93.6% | 91.8% |
TrainTalk Archive
- Google Translate

