Forecast of MTA, NYCT, MNR, LIRR, B&T, MTA CC, MTA BUS and SIR Contracts
to be Advertised and Proposals to be Solicited


Bridges and Tunnels
Brief Description of Work
DEC 2011

VN-80B
CONSTRUCTION ADMINISTRATION FOR UPPER LEVEL DECK REPLACEMENT OF THE ROADWAY DECKS OF THE UPPER LEVEL SUSPENDED SPAN OF THE VERRAZANO-NARROWS BRIDGE
$10M to $50M

The Construction Scope of Work shall include removal of existing upper roadway deck and barrier, installation of new upper level orthotropic deck, overlay, drainage systems, sign structures, lighting, barriers, MPT, and miscellaneous utility work. The Inspection Services provided by the Consultant shall be performed under the general direction of the Triborough Bridge and Tunnel Authority, and shall include consulting, advising and making recommendations to the Engineer and the Contractor during the course of the work. The Consultant shall provide all on-site inspection and ensure the materials furnished and the work performed is in accordance with the Contract documents. Some of the work will be performed at night or on weekends.

Duration of Contract 60 Months


Bridges and Tunnels
Brief Description of Work
FEB 2012

VN-87
DESIGN AND DESIGN SERVICES DURING CONSTRUCTION VN-87 REHABILITATION OF SUBSTATION # 1
$500K - $1M

General scope of services: The Consultant shall provide all the necessary design services required to prepare a complete set of bid documents in order to rehabilitate electrical substation # 1 at the VNB facility. The work shall include the following representative design tasks:

Duration of Contract 36 Months


Bridges and Tunnels
Brief Description of Work
MAR 2012

BW-97B
CONCRETE REPAIRS AND INSTALLATION OF DEHUMIDIFICATION SYSTEMS IN THE BRONX AND QUEENS ANCHORAGE
$5M - $10M

This Project includes concrete repairs to the exterior and interior of the Bronx Anchorage and the installation of a dehumidification system in both the Bronx and Queens Anchorage. Representative tasks include the following:

Duration of Contract 18 Months


BW-97B
CONSTRUCTION MANAGEMENT FOR THE ANCHORAGE CONCRETE REPAIRS AND INSTALLATION OF DEHUMIDIFICATION SYSTEMS IN BOTH THE BRONX AND QUEENS ANCHORAGE
$500K - $1M

Construction project Description. This Project includes concrete repairs to the exterior and interior of the Bronx Anchorage and the installation of a dehumidification system in both the Bronx and Queens Anchorage. The Inspection Services provided by the Consultant shall be performed under the general direction of the Triborough Bridge and Tunnel Authority, and shall include consulting, advising and making recommendations to the Engineer and the Contractor during the course of the work. The Consultant shall provide all on-site inspection and ensure that the materials furnished and the work performed are in accordance with the contract documents. Following is a representative list of the consultant's primary duties and responsibilities.

Duration of Contract 24 Months


Bridges and Tunnels
Brief Description of Work
APR 2012

QM-30
FACILITY-WIDE ELECTRICAL UPGRADE AND VENTILATION BUILDINGS SWITCHGEAR AND MOTOR CONTROL CENTERS REPLACEMENT AT THE QUEENS MIDTOWN TUNNEL
OVER $50M

This project will replace existing switchgear sections at the Queens Midtown Tunnel facility in order to enhance the safety, reliability and flexibility of the tunnel's electrical power system. The scope of work for the project includes the following representative tasks:

Duration of Contract 54 Months


Long Island Rail Road
Brief Description of Work
DEC 2011

L09428(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
SUBSTATION REPLACEMENT
$10M - $50M

Replacement of existing substations in Hillside and Kew Gardens, Queens.

Duration of Contract 30 Months


Long Island Rail Road
Brief Description of Work
JAN 2012

L08828
NEW ATLANTIC TERMINAL ELEVATOR
$1M - $5M

Installation of a 2nd elevator at Atlantic Terminal.

Duration of Contract 24 Months


L09761
JAMAICA STATION HEADQUARTERS BUILDING EXTERIOR REHABILITATION
$5M - $10M

Restoration of exterior building elements to bring landmark facility to State of Good Repair.

Duration of Contract 12 Months


Metro-North Railroad
Brief Description of Work
DEC 2011

M08807
PARK AVE TUNNEL RENEWAL
$5M - $10M

The renewal of the Park Avenue Tunnel will consist of the construction of repairs to the tunnel masonry walls, the tunnel arch ceiling and to the ventilation shafts. The repairs will include:

Duration of Contract 23 Months


M09235*
PROCURE/INSTALL CAB SIGNAL EQUIP WEST OF HUDSON
$10M - $50M

This project will procure and install a new 100 Hz Cab Signal system replacing existing wayside signal system for the West of Hudson Port Jervis Line between Suffern, NY (MP 31.3) and Sparrowbush, NY (MP 89.9). This system will be consistent with NORAC (Northeast Operating Rules Advisory Committee) and NJT (New Jersey Transit) operating rules. This project will extend cab signal system from NJT's territory (East of Suffern) to MNR territory up to the division post at MP 89.9. Representative tasks include the following:

Duration of Contract 17 Months


M09252
PROCURE/FABRICATE FIELD CODE SYSTEM-MOTT HAVEN
$500K - $1M

Currently, CP-4(Harlem River Lift Bridge), CP-5(Mott Haven), CP-6(Yankee Stadium) and CP-106 (Melrose) are controlled from a single field code system. This represents a significant single point of failure within a key Mott Haven junction point. The current equipment is at the end of its useful life. The project will replace the single field code system, local control panel and non-vital relay systems with a distributed code system comprising of four new code systems, local control panels and fiber optic cable between each interlocking. Representative tasks include the following:

Duration of Contract 23 Months


M09621*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
CONSTRUCTION - WEST OF HUDSON SIGNAL IMPROVEMENTS
$10M - $50M

This project is for a contractor to provide engineering, installation and testing of direct burial and aerial inner duct, signal and communication cables and related hardware, pole line infrastructure, cable trough systems, signal house, case and mast foundation installations for the new signal system on the West of Hudson Port Jervis Line between Suffern, NY (MP 31.3) and Sparrowbush, NY (MP 89.9). Representative tasks include the following:

Duration of Contract 17 Months


Metro-North Railroad
Brief Description of Work
JAN 2012

M09148
DESIGN/BUILD - PARK AVE VIADUCT DIRECT FIXATION
$1M - $5M

This Design/Build contract is for the investigation and design of the rehabilitation of the direct fixation system that supports the running rails and the third rails for all four tracks atop the Park Avenue Viaduct from East 110th Street to East 131st Street. It will also perform a pilot construction project to replace a number of the existing fasteners in order to test the design resulting from the investigation.

Duration of Contract 21 Months


M09212/13/17/21/22/23(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PROCURE WAYSIDE, ONBOARD & RADIO COMM. EQUIP
OVER $50M

Congress passed the Rail Safety Improvement Act of 2008 which requires that all commuter railroads implement a Positive Train Control System (PTC) on it's mainline tracks by Dec 31, 2015. PTC is a system designed to prevent train-to-train collisions, over speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position. This project will provide for the procurement of radio/communication equipment, onboard equipment and wayside equipment. Representative tasks include the following:

Duration of Contract 40 Months


Metro-North Railroad
Brief Description of Work
MAR 2012

M09173*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
CONSTRUCTION WOODBURY VIADUCT
$1M - $5M

The repairs to the Woodbury Viaduct will consist of the reconstruction of the east abutment backwall, repairs to the deteriorated concrete on three of the pedestals supporting the superstructure. Reinforcement of a pier footing located in a creek against scour by the placement of riprap, replacement of four expansion bearings located at both the east and west abutments and repairs to deteriorated stiffener angles located at two of the superstructure expansion joints.

Duration of Contract 10 Months


Metro-North Railroad
Brief Description of Work
APR 2012

M09444*
CONSTRUCTION - HARLEM RIVER LIFT BRIDGE BREAKER HOUSE CONTROLS
$5M - $10M

This contract provides for the replacement of the electrical control system that raises and lowers the Harlem River Lift Bridge (HRLB) on the Hudson Line for river traffic on the East River. The HRLB is a critical facility on the Metro-North system in that every train running to and from Grand Central Terminal needs to traverse this bridge which links Manhattan to the South Bronx. Put into service in 1954 the bridge remains electronically and mechanically mired in technology more than 50 years old. Electrical equipment used in the mechanisms for controlling, opening and closing the bridge consists of antiquated electro-mechanical relays and other components no longer available to replace. This antiquated control system will be replaced with a modern day PLC (Programmable Logic Controller) based system. The entire traction power system on the bridge will also be replaced. This system consists of two circuit breaker houses (CBH#6 and CBH#7) which will be replaced with modern day 700V DC switchgear housed in two pre-fabricated buildings. All of the positive and negative cables as well as the positive and negative contactors on the bridge will also be replaced.

Duration of Contract 26 Months


Metro-North Railroad
Brief Description of Work
JUN 2012

M09403*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
CONSTRUCTION OF BREWSTER SUBSTATION
$5M - $10M

This project provides for the construction of (1) new traction power substation on the Upper Harlem line at Brewster Station. The substation building will be prefabricated at the factory and installed on a pre-constructed concrete pad. Work shall include:

Duration of Contract 20 Months


M09404*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
CONSTRUCTION 86TH STREET SUBSTATION
$5M - $10M

This project provides for the replacement and expansion of the 86th Street Substation located within the Park Ave Tunnel. The existing substation equipment will be removed and replaced with new traction power transformers, rectifiers, and switchgear. The roof and walls of the existing structure will also be waterproofed. Work shall include:

Duration of Contract 24 Months


M09405*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
CONSTRUCTION 110TH STREET REACTOR
$1M - $5M

This contract provides for the replacement of (4) negative return reactors at the 110th St. Substation with new larger capacity units. The new reactors will be installed on a new cantilevered structure that will be constructed on the side of the Park Ave Viaduct. Work shall include:

Duration of Contract 12 Months


M09424 (NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PURCHASE MOBILE MOTOR-ALTERNATOR SET
$500K - $1M

This project will provide for the purchase of a trailer-mounted mobile motor-alternator unit that can be transported as necessary to provide back-up signal power. This mobile unit will convert 60 Hz power from the utility into 100 Hz power for Metro-North's signal system. Work shall include:

Duration of Contract 12 Months


MTA Bus
Brief Description of Work
JAN 2012

SF01-7321*
SECURITY IMPROVEMENTS: EASTCHESTER AND LAGUARDIA DEPOTS
$5M - $10M

This project will furnish and install equipment and materials required for a complete Security System at both the Eastchester and LaGuardia Bus Depots. The system will include Access Control, Intrusion Detection and a Closed Circuit Television (CCTV) system. This project also includes the removal and replacement of specified sections of the existing perimeter fencing with new perimeter fencing and an access gate at LaGuardia Depot only.

Duration of Contract 9 Months


MTA Bus
Brief Description of Work
MAY 2012

SF01-7407*
SECURITY IMPROVEMENTS: FAR ROCKAWAY AND BAISLEY PARK DEPOTS
$5M - $10M

This project will furnish and install equipment and materials required for a complete Security System at both the Far Rockaway and Baisley Park Depots in the borough of Queens. The system will include access controls, perimeter fencing, lighting, security booths, alarms and a Closed Circuit Television (CCTV) system.

Duration of Contract 8 Months


MTA Bus
Brief Description of Work
JUN 2012

SF07-7411*
NEW APRON - JFK DEPOT
$5M - $10M

This project will replace the existing apron at the JFK Depot, located in the borough of Queens, and incorporate paving, security fencing, lighting, drainage, access controls and installation of eight rapid roll up doors with traffic lights. The Apron/ Exterior Bus Parking lot at JFK is approximately 90,000 sqft. or 2 acres. The apron has inadequate drainage, lighting, asphalt pavement, and security; along with access controls that have reached beyond their useful life.

Duration of Contract 12 Months


New York City Transit
Brief Description of Work
DEC 2011

C34793*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PAINT LINE STRUCTURE
$10M - $50M

This project will paint a portion of the IRT from the Portal North of 3rd Ave/149th Street Station to East 180th Street Station on the White Plains Road Line in the borough of the Bronx. The work includes the removal of loose paint, dirt, grease, and grime using hand and power tools. Following surface preparation, three coats of alkyd-based paint will be applied on all steel surfaces. This project will also include some steel repairs.

Duration of Contract 32 Months


ST22-7426
STATION RENEWAL - 5 LOCATIONS
$10M - $50M

This project will repair select elements within five stations on the Myrtle Line in the boroughs of Brooklyn and Queens . The stations are Central Avenue, Seneca Avenue, Forest Avenue, Knickerbocker Avenue, and Fresh Pond Road. The station renewal will eliminate all major deficiencies in each station as determined by the Station Condition Survey and may include the repair or replacements of platforms, platform edges, mezzanines, windscreens, and stairs. Station aesthetics will be improved through the painting of the station and installation of artwork.

Duration of Contract 22 Months


New York City Transit
Brief Description of Work
JAN 2012

A36193
STATION COMPONENTS REPAIR: BRICK ARCHES 168TH STREET & 181ST STREET
$10M - $50M

This project will remove, stabilize, and repair brick arch sections that span the tracks and platforms at the 168th and 181st street stations on the IRT Broadway/7th Avenue Line in the borough of Manhattan. Work will include replacement with panels, repairs to the architectural elements and associated electrical and communications work. Both stations are listed on the National Register of Historical Places; accordingly, the repairs must be consistent with historical standards.

Duration of Contract 34 Months


C43041
UPGRADE STATION COMMUNICATION ROOM HVAC, PHASE 2: 7 STATIONS
$1M - $5M

This project will upgrade the HVAC system at various communication rooms located in the borough of Brooklyn. Work will vary per location but may include the modification/relocation of fans, installation of self contained or wall mounted AC units, or installation of split AC units with associated duct work and refrigerant piping. Locations include:

Duration of Contract 12 Months


C43042
UPGRADE STATION COMMUNICATION ROOM HVAC, PHASE 2: 6 STATIONS
$1M - $5M

This project will upgrade the HVAC system at various communication rooms located in the borough of Queens. Work will vary per location but may include the modification/relocation of fans, installation of self contained or wall mounted AC units, or installation of split AC units with associated duct work and refrigerant piping. Locations include:

Duration of Contract 12 Months


C43043
UPGRADE STATION COMMUNICATION ROOM HVAC, PHASE 2: 9 STATIONS
$1M - $5M

This project will upgrade the HVAC system at various communication rooms located In Manhattan. Work will vary per location but may include the modification/relocation of fans, installation of self contained or wall mounted AC units, or installation of split AC units with associated duct work and refrigerant piping. Locations include:

Duration of Contract 12 Months


New York City Transit
Brief Description of Work
MAR 2012

E31112(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
REPLACE 3 BUS WASHERS
$5M - $10M

This contract will replace the three existing bus washers, including arches, brushes, scrubbers, guide rails, skid plates, tanks, piping, drains, pumps, and other miscellaneous items at the Manhattanville Bus Depot in the borough of Manhattan. Work will include the removal of existing equipment and related items, site preparation, civil, structural and electrical work as required, and installation of new equipment and related items. Major work elements include the following:

Duration of Contract 21 Months


New York City Transit
Brief Description of Work
APR 2012

A36164*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PROVIDE STATION ACCESSIBILITY IMPROVEMENTS: 68 ST-HUNTER COLLEGE
$10M - $50M

This project will provide full ADA (Americans with Disabilities Act) accessibility at the 68th Street Station on the IRT Lexington Avenue Line in the borough of Manhattan. The station has been identified as an ADA Key Station. Work will include improvements to vertical accessibility, provision of an accessible travel route, platform edge reconstruction to meet ADA boarding requirements, modification of control area gates and signage.

Duration of Contract 36 Months


C33131*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PAINT LINE STRUCTURE
$10M - $50M

This project will paint the elevated structure of the BMT Jamaica Line from bent No. 779 west of Broadway Junction - Eastern Parkway (north of Alabama Avenue Station) to Cypress Avenue Station located in the borough of Brooklyn. Work will include the removal of all loose paint, dirt, grease, and grime using hand tools and power tools. Following surface preparation three coats of alkyd-based paint will be applied on all steel surfaces.

Duration of Contract 24 Months


C33848*
PROVIDE PERIMETER HARDENING: RCC, PCC & 130 LIVINGSTON
$10M - $50M

This project will enhance the security of the Power Control Center (PCC) and the Rail Control Center (RCC) located in the borough Manhattan along with 130 Livingston Plaza in the borough of Brooklyn. Work will include installation of bollards around the facilities, enhanced security at garage entrances, and any lighting, CCTV, alarms, or other equipment necessary for the control and monitoring of the security apparatuses.

Duration of Contract 12 Months


S32754*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
INSTALL SIGNAL EQUIPMENT: UNION TURNPIKE — KEW GARDENS AND 71ST — CONTINENTAL AVENUE
OVER $50M

This project will modernize and improve the reliability of the 71st Avenue and Union Turnpike interlockings located on the IND Queens Boulevard Line in the borough of Queens. Work will include replacement with new conventional relay-based interlockings which are CBTC ready (capable for interfacing with the future CBTC signal system) and the construction of new relay rooms to house all associated equipment. The interlockings will be controlled from these relay rooms and the new 71st Avenue Master Signal Tower (being built under this contract). A separate contract for the engineering and furnishing of the signal equipment will be awarded.

Duration of Contract 57 Months


S32769*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
DESIGN AND FURNISH SIGNAL EQUIPMENT FOR TWO INTERLOCKINGS: 71ST — CONTINENTAL AVENUE AND UNION TURNPIKE — KEW GARDENS
OVER $50M

This contract will consist of engineering and furnishing signal equipment to be installed (under a separate and coordinated contract) at the existing interlockings at 71st – Continental Avenue and Union Turnpike – Kew Gardens, located on the IND Queens Boulevard Line in the borough of Queens. A separate contract will be awarded to be closely coordinated with this contract for the installation of the signal equipment and all other associated work.

Duration of Contract 53 Months


New York City Transit
Brief Description of Work
MAY 2012

C40481(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
UPGRADE TANKS AT 2 BUS DEPOTS
$1M - $5M

This project will upgrade the underground fuel tank sumps at the Fresh Pond Bus Depot and the Jamaica Bus Depot, both located in the borough of Queens. Specific tasks include replacing the manhole covers of fuel tank sumps at the Jamaica Bus Depot and replacing the manhole covers of the sumps, sumps and top slab at the Fresh Pond Bus Depot. Work includes structural, mechanical and electrical work.

Duration of Contract 13 Months


E31292*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
NEW VENTILATION FACILITY AT 46TH STREET AND NORTHERN BLVD
OVER $50M

This project will provide a new ventilation facility for the IND Queens Blvd. Line 'E' & 'F' express train service between 36th St. and 65th St. Stations below the Northern Blvd. bypass section at 46th Street in the borough of Queens. Work will include a new underground structure, plenum, vent bays and flues, and furnishing and installation of associated electrical and mechanical systems. The construction of the new structure will also involve major site excavation and underground utilities work. Incidental work will include communication, instrumentation & controls, utility and niche closures. The work will conform to the latest Federal, State and NYCT standards. Specific tasks include the following:

Duration of Contract 36 Months


New York City Transit
Brief Description of Work
JUN 2012

C30401(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
REHABILITATE DEEP WELLS: PHASE 2
$5M - $10M

This project will rehabilitate eight (8) deep wells on the IRT Nostrand Avenue Line in the borough of Brooklyn. The deep wells are installed for controlling ground water surrounding the subway tunnel to prevent water infiltration. Work will include structural rehabilitation of well enclosures, new personnel access hatch, new control system including fiber-optic based communication network for remote monitoring and control of deep wells operation and all other associated and incidental work.

Duration of Contract 21 Months


C34191*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PRIORITY REPAIRS AT MASPETH WAREHOUSE
$5M - $10M

This project will perform priority repairs to the Maspeth Warehouse, located at 55-04 Maspeth Avenue in the borough of Queens, to prevent further deterioration of the facility. Work includes architectural, structural, mechanical and electrical work.

Duration of Contract 11 Months


C34906*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
UPGRADE DC POWER FEEDERS: 207 ST. MAINTENANCE SHOP
$10M - $50M

This contract will upgrade the existing DC power feeders and distribution system at 207 Street Maintenance Shop in the borough of Manhattan. The existing system will be totally removed and replaced, and the new system will include enhanced safety features and controls. Work will include installation of several systems and assemblies, such as a new DC Power Room, positive and negative feeders, new trolley and stringer assemblies, and insulated joints. Electrical and communications equipment will also be installed. Major tasks include the following:

Duration of Contract 24 Months


E31113(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
UPGRADE EQUIPMENT FOR 7 BUS WASHERS
$5M - $10M

This project will upgrade equipment for seven bus washers at three bus depots. Three bus washers will be upgraded at the Kingsbridge Depot, located in the borough of Manhattan, two bus washers will be upgraded at the Gun Hill Depot in the borough of the Bronx, and two bus washers will be upgraded at the Casey Stengel Depot in the borough of Queens. Work will include the removal of existing equipment and related items, site preparation, civil, structural and electrical work as required, and installation of new equipment and related items. Major work elements include the following:

Duration of Contract 21 Months


S32749*
MODERNIZE SIGNAL SYSTEM: ROOSEVELT INTERLOCKING
OVER $50M

This contract consists of rehabilitating and modernizing the signal system and constructing new enclosures at the existing interlocking at the Roosevelt Avenue Station, located on the IND Queens Boulevard Line in the borough of Queens. The Roosevelt Avenue Interlocking shall be replaced with a new modern relay-based interlocking and shall be made CBTC ready (capable for interfacing with the future CBTC signal system). This contract will also furnish and install a new relay room to house all necessary equipment for the new interlocking. The Roosevelt Avenue interlocking will be controlled from the new relay room as well as from the new 71st Avenue Master Signal Tower (being built under a separate contract).

Duration of Contract 47 Months


Capital Construction
Brief Description of Work
DEC 2011

C-26010*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
96TH STREET STATION
Over $100M

This contract is for the construction of an underground station including entrances, ancillaries, finishes and MEP systems. This contract follows C-26005, which included the construction of exterior station slurry walls, utility relocation, excavation and installation of road decking. The scope of work on this contract includes, but not limited to the following:

Duration of Contract 39 Months


C26512
CONSTRUCTION OF STATION ENTRANCE AT SITE P
$50M - $100M

This Contract is for the construction of the an underground station entrance structure including foundation walls, overbuild shear walls, slabs, columns, footings, finishes and systems and two (2) steel and glass canopies over the station entrances. The scope of work includes, but is not limited to:

Duration of Contract 43 Months


C-52101*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
ATLANTIC TERMINAL, ATLANTIC AVENUE AND PACIFIC ST. STATION COMPLEX PERIMETER PROTECTION
$1M - $5M

This Contract is structural perimeter protection of the LIRR's Alantic Terminal and NYCT's Alantic Avenue and Pacific Street Station Complex. The work shall include but is not limited to:

Duration of Contract 15 Months


VS086*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
PROCURE TUNNEL SIGNAL EQUIPMENT - SYSTEMS PACKAGE 3
$10M - $50M

This Contract shall complete the final design, fabricate, furnish and deliver the signal central instrument room and wayside signal equipment for the ESA Tunnels. All equipment shall be installed by the CS284 contractor. The basic equipment includes; LED Signals, Power Supplies, Power Distribution Panels, Breakers, Busses, Junction Boxes, Conduit, Transfer Switches, Control Panels, Terminals, Tags, Pre-Wired Racks — Track, Vital, Ground Detect, Maintainer's Diagnostic System, Test Rack System, Maintainer's Workstations, Cab Signal Code Relays, Local Area Network (LAN) linking CIRs, Event Recorders, Impedance Bonds and Microprocessor-based Equipment

Duration of Contract 20 Months


Capital Construction
Brief Description of Work
JAN 2012

CS284*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
SYSTEMS PACKAGE 2
Over $100M

This Contract is for furnishing and installing multiple tunnel systems for the entire length of the ESA Project. The work shall include, but is not limited to, the following:

Duration of Contract 48 Months


Capital Construction
Brief Description of Work
MAR 2012

CH057*
HAROLD STRUCTURES — PART 3,
Over $100M

This Contract shall be responsible for earth and site work, utility relocations, track realignment, drainage, and construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens. The scope of work shall include but is not limited to:

Duration of Contract 30 Months


T0901*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
FABRICATE AND FURNISH TWO LOW EMISSION DIESEL LOCOMOTIVES
$1M - $5M

This work scope shall be responsible for the design, development, fabrication, testing and delivery of two (2) low emissions, engine-generator locomotives to support in-service testing, commissioning and operations for the Long Island Rail Road East Side Access Service to Grand Central Terminal Station.

Duration of Contract 24 Months


Capital Construction
Brief Description of Work
APR 2012

CM014B*(NOTE: FULL FUNDING NOT IN PLACE FOR THIS PROJECT)
CONSTRUCTION OF GCT CONCOURSE AND FACILITIES FIT-OUT
Over $100M

This Contract is for the construction of the new LIRR Grand Central Terminal (GCT) Concourse facility which includes foundation, underground utilities, CMU walls, structural steel framing, mechanical, electrical, plumbing, fire protection, and architectural finishes. This contract also provides the construction for the fit-out of 44th Street Ventilation and 50th Street Ventilation Facilities. The scope of work includes, but is not limited to:

Duration of Contract 35 Months

* Partially funded by Federal Grant(s)