Back to Long Island Rail Road performance indicators
Long Island Rail Road
On-Time Performance
| Sep 2008: 95.2% | Jan — Sep 2008: 95.4% |
| Sep 2009: 95.6% | Jan — Sep 2009: 95.6% |
On-Time Performance By Line

Babln |
Far Rock |
Hicks/ Hunt |
Hemp |
Long Beach |
Montk |
Oyster Bay |
Port Jeff |
Port Wash |
Grnpt/ Ronk |
West Hemp |
|
2008 |
95.0 |
97.5 |
94.7 |
97.6 |
96.9 |
94.1 |
92.8 |
93.9 |
94.4 |
93.4 |
97.7 |
2009 |
95.6 |
98.3 |
95.1 |
98.1 |
94.9 |
93.5 |
95.1 |
94.9 |
94.9 |
94.6 |
97.7 |
On-Time Performance is the percentage of commuter trains that arrive at their destination within 5 minutes and 59 seconds of the scheduled time. This indicator is a measure of service reliability.
- MTA Home
- NYC Transit
- Long Island Rail Road
- Long Island Bus
- Metro-North Railroad
- Bridges & Tunnels
- Capital Construction
- Bus Company




