Service Change  Posted: 03/28/2015  8:15PM

M100 buses are detoured, due to construction on E 125 St and 1 Av.

Detour is as follows:

Eastbound: Via 125 St, left on 3 Av, right on E 127 St, right on 2 Av, stand at near side of E 126 St.

Allow additional travel time. 



Delays  Posted: 03/28/2015  8:14PM

M31 buses are running with delays in both directions, due to a closure on the upper level of the Queensboro Bridge.

Allow additional travel time.



Delays  Posted: 03/28/2015  8:14PM

M1, M2, M3, M5, M14A, M14D, M21 and M103 buses are running with delays in both directions, due to a street closure on 2 Av between 14 St and E Houston St.

Allow additional travel time.



Service Change  Posted: 03/28/2015  8:13PM

M8, M15 and M15-SBS buses are detoured, due to a partial building collapse on 2 Av at 8 St.

Detour is as follows:

M15 and M15-SBS Southbound: Via 2 Av, right on 23 St, left on 3 Av, left on Houston St, right on Chrystie St and regular route.

M8 Eastbound: Via St. Marks Pl, left on 3 Av, right on 14 St, right on Avenue A, left on 10 St and regular route.

All corresponding stops will be made on the detoured route.

M8, M14A and M14D are running with extensive delays in both directions.

Allow additional travel time.



Planned Detour
M15/M15 SBS - Northbound bus stop on 1 Av at 28 St temporarily closed


Until Summer 2015

Due to construction, please use nearby stops:

M15: 1 Av at 25 St.
M15 SBS: 1 Av at 24 St.

Reminder: M15 SBS buses do not operate overnight.




Planned Detour
M15 - Northbound bus stop on 1 Av between E 86 St and E 87 St temporarily relocated


Until further notice