Projects to be solicited through early 2026
Additional projects to be added as information becomes available.
Project |
Method |
Agency |
---|---|---|
215 St Signal Shop Component Repairs |
Design-Bid-Build |
NYCT |
Brooklyn Bridge‐City Hall Vents and Mezzanine Ceiling / Lexington Avenue Line |
Design-Bid-Build |
NYCT |
Component Repairs: Coney Island Overhaul Facility |
Design-Bid-Build |
NYCT |
Division of Car Equipment (DCE) Shop Components: Various Facilities |
Design-Bid-Build |
NYCT |
Governors Island Vent Building Fender/Pedestrian Footbridge Rehab |
Design-Bid-Build |
NYCT |
Grand Central Terminal Cameras Package 1 |
Design-Bid-Build |
Metro-North |
Hillside Yard Lighting & Amenities |
Design-Bid-Build |
LIRR |
HVAC and Power Upgrades at the Rail Control Center |
Design-Bid-Build |
NYCT |
Laser Intrusion Detection System |
Design-Bid-Build |
NYCT |
Moodna/Woodbury Viaduct Repairs |
Design-Build |
Metro-North |
Rehabilitate Ducts: Hanover Sq-Pearl St Substation / Clark Street Line |
Design-Bid-Build |
NYCT |
Ronkonkoma Trainwash Sewer Connection & Upgrade |
Design-Bid-Build |
LIRR |
Sandy Resiliency (Street Level Openings): Various Locations System-wide |
Design-Bid-Build |
NYCT |
Station Work: 4 Stations / Second Avenue Line |
Design-Bid-Build |
NYCT |
Project |
Method |
Agency |
---|---|---|
Atlantic Terminal Water Remediation & Structural Repairs |
Design-Bid-Build |
LIRR/NYCT |
Bridge Replacement Program - Highway Bridges |
Design-Build |
LIRR |
Car Washer Component Repairs: Canarsie, Jamaica & 207 St |
Design-Bid-Build |
NYCT |
Column Repairs: Rockaway, New Lots, and Liberty Lines |
Design-Bid-Build |
NYCT |
Grand Central Terminal Fire Stand Pipe - Phase 2 |
Design-Bid-Build |
Metro-North |
Life Cycle Replacement of Signal Code Systems - Phase II: Various Locations System-wide |
Design-Bid-Build |
NYCT |
Police District Office Rehabilitation: 14 St-Union Square |
Design-Bid-Build |
NYCT |
Rehabilitate Emergency Exits: Various Locations System-wide |
Design-Bid-Build |
NYCT |
Replace Components at Hunter North and South Substations / Queens Boulevard Line |
Design-Bid-Build |
NYCT |
Structural Painting and Repair: Queensboro Plaza - 33 St / Flushing Line |
Design-Bid-Build |
NYCT |
Project |
Method |
Agency |
---|---|---|
ADA and Platform Replacement: Bellerose and Floral Park |
Design-Build |
LIRR |
ADA Package 8: 5 Stations (Neptune Av / Culver Line, 18 Av / West End Line, Jefferson St / Canarsie Line, Nostrand Av / Fulton Line, Fort Hamilton Pkwy / West End Line) |
Design-Build |
NYCT |
ADA Package 10: 3 Stations (Morrison Av-Soundview / Pelham Line, 2 Av / 6 Av Line, 7 Avenue / Queens Boulevard Line) |
Design-Build |
NYCT |
ADA Package 11: 3 Stations (145 St / 8 Avenue Line, 110 St / Lexington Avenue Line, Wakefield-241 St / White Plains Road Line) |
Design-Build |
NYCT |
Communications Based Train Control (CBTC) 6 Avenue and 63rd St Lines: Supply Equipment |
Design-Build |
NYCT |
Fan Plant Component Repairs: Various Locations System-wide |
Design-Bid-Build |
NYCT |
Hudson Line Track 1 Electrification, Culvert Rehabilitation and Replacement, and Rock Slope Remediation |
Design-Build |
Metro-North |
Station Component State of Good Repair Work (30 Stations) |
Design-Build |
NYCT |
Station Renewals at 2 Stations (51 St / Lexington Av Line and 181 St / 8 Av Line) and Station Component State of Good Repair Work (28 Stations) |
Design-Build |
NYCT |
Structural Rehabilitation and Painting (Throgs Neck Bridge) |
Design-Bid-Build |
B&T |